For the first time in a long time this past weekend I felt I was at my capacity with epoxy resin. About two weeks ago I got an inquiry on a special commission to do a clients two bathroom counters. The following week I went to do the estimate. A few days later deposit was made and work was in progress. I do work a 9 to 5 so I started prepping on Friday after work and worked through the weekend it was a lot of work to say the least. I learned a lot while working and experience a few issues I had to work through. Working around the sink and the surface not level. At least three times I had sweat running down my forehead from nerves but I prevailed. She had this soap dispenser with an image on it that resembled a dirty pour as her reference picture. I nailed the colors perfectly and replicated the same style, she loved it! As I am finishing the first bathroom counter I feel a sense of relief and accomplishment. I did the harder bathroom first so the last one should be a breeze. I cannot wait to show you all both of them complete this picture was me doing the backsplash area with the work on the bottom counter already done and waiting a top coat.
~ Heart’s Desire